Drilling Technical Dept. of Saudi Aramco, testing

Published on 8 December 2020

Featured Image

In collaboration with Drilling Technical Department of Saudi Aramco, Future Pipe Saudi Arabia successfully tested 11” and 19.7” of WellstrongTM casing with Annular BOP, as a pre-pilot deployment simulation and performance test.

For better web experience, please use the website in portrait mode